Chapter 12. Master Production Scheduling and Material Requirement Planning

Table of Contents
12.1. Capabilities and Limitations of MPS and MRP in PostERP
12.2. Purpose of Running MPS and MRP
12.3. the Order Running MPS and MRP
12.4. Efficiency Issue of the Explosion of MPS and MRP

This chapter introduces the data relations and the calculation logic of master production scheduling (MPS) and material requirement planning (MRP).

Both MPS and MRP calculate and show their results in terms of Time Phased Ordered Planning (TPOP).